团结、诚信、务实、创新

Unity, integrity, pragmatism and innovation

Sanchaxi second-cascade Hydropower Station, Taishun County (2*4MW)

•Entrusted by Taishun Sanchaxi Secondary Hydropower Co., (2008-)
•Installation capacity: 2*4MW, Vertical mixed-flow unit, Water head: 27.12m, Storage capacity: 1.3 million m3, Maximum discharge: 3110 m3 /s
•composed of concrete gravity dam (5 holes and 10 meters arc gate), power generation and diversion tunnel, power plant, booster station, 110 kV transmission line, etc.
•Conventional traditional equipment for protection and automation
•Completion time: 2001

•Although the installed capacity is small, due to the low water head, the unit volume is larger than Nan Sam 3B

Outdoor scene of Sanchaxi Second-cascade Hydropower Station


Interior of Sanchaxi Second-cascade Hydropower  Station


Reservoir of SanjiaxiSanchaxi Second-cascade  Hydropower Station


Tail water of Sanjiaxi Hydropower Station