TYPICAL CASE

Comprehensive Automation Transformation of Sanchaxi River Second Hydropower Stat

(The major overhaul of Unit 1 of Laowohe Fouth Hydropower Station in 2024

The major overhaul of Unit 2 of Bajiaohe River First Hydropower Station in 2024

Operation and maintenance of the Sanchaha Hydropower Station

Operation and maintenance of QimaBa Hydropower Station

Operation and maintenance of the Nanmenxia First Hydropower Station

Operation and maintenance of the Liushahe First Hydropower Station

Operation and maintenance of the Laowohe Fourth Hydropower Station

Maintenance of Sluice Gate, Zhujiazhan Station

Hoist Maintenance of Longjiang Sluice Gate

Jiangnan Coastal Reclamation Project

Electrical Testing Projects

Baishuiji Hydropower Station

Gechangqiao Hydropower Station

Mushuitian Hydropower Station

Dongning Jing Hydropower Station

Sanchaxi Hydropower Station

Adjustment of thrust bush for overhaul of Qingshan Reservoir Hydropower Station

Rotor hoisting for unit overhaul of Qingshan Reservoir Hydropower Station

10 kV Switch cabinet of Datanmen Hydropower Station

Generator Set of Datanmen Hydropower Station

Rotor Coring of Unit 3 in Dazhaihe Third cascade Power Station

Qingshan Reservoir Hydropower Station, Hangzhou(4×0.63MW+1×0.4MW)

Yangxihe Cascade Hydropower Station, Yuanyang County(23.5MW,2*6.6+3*3.5)

Fengchunling Cascade Hydropower Station, Yuanyang County(36.6MW)

Dazhaihe Third-cascade Hydropower Station, Jinping(3*5MW)

Nanhe First-cascade Hydropower Station, Yunxian County(2*20MW)
