Nanhe First-cascade Hydropower Station, Yunxian County(2*20MW)
•Entrusted by Yunnan Yunxian Asia-Pacific Investment and Real Estate Co., Ltd. (2009~2010)
•Project content
–Start-up operation, operation
preparation, daily operation and maintenance management and staff technical
training
•Installation capacity:2*20MW,
vertical mixed-flow unit, rated water head 70 m, total reservoir capacity
:11.52 million m3. Maximum discharge volume:1458 m3 /s
•Composed of concrete arch dam (2
orifices 8 meters arc gate), power generation diversion tunnel, power plant,
booster station, 110 kV transmission line, etc..
•Designed principle: "no one on
duty, few on waiting",
•Controlled by integrated automatic computer monitoring system.
•Entrusted by Yunnan Yunxian Asia-Pacific Investment and Real Estate Co., Ltd. (2009~2010)
•Project content
–Start-up operation, operation
preparation, daily operation and maintenance management and staff technical
training
•Installation capacity:2*20MW,
vertical mixed-flow unit, rated water head 70 m, total reservoir capacity
:11.52 million m3. Maximum discharge volume:1458 m3 /s
•Composed of concrete arch dam (2
orifices 8 meters arc gate), power generation diversion tunnel, power plant,
booster station, 110 kV transmission line, etc..
•Designed principle: "no one on
duty, few on waiting",
•Controlled by integrated automatic
computer monitoring system.