Dazhaihe Third-cascade Hydropower Station, Jinping(3*5MW)
•Entrusted by Yunnan Jinping Kanghong Hydropower Development Co., Ltd. (2008~2012)
•Project content
–Start-up operation, operation
preparation, operation and maintenance,establishment
of project accounts
–Individual acceptance, Completion
acceptance
•Installation capacity:3*5MW,
Horizontal Pelton, rated water head 500m, total
reservoir capacity :300 million m3.
•Composed of river dam, power
generation diversion tunnel, surge well, pressure pipeline, power plant,
booster station, 110 kV transmission line, etc.
•Designed principle: "no one on
duty, few on waiting",
Controlled by integrated automatic computer monitoring system.
Main Building of Dazhaihe Hydropower Station
110
kV Booster Station of Dazhaihe Hydropower Station