团结、诚信、务实、创新

Unity, integrity, pragmatism and innovation

Dazhaihe Third-cascade Hydropower Station, Jinping(3*5MW)

•Entrusted by Yunnan Jinping Kanghong Hydropower Development Co., Ltd. (2008~2012)
•Project content
–Start-up operation, operation preparation, operation and maintenance,establishment of project accounts
–Individual acceptance, Completion acceptance
•Installation capacity:3*5MW, Horizontal Pelton, rated water head 500m, total reservoir capacity :300 million m3.
•Composed of river dam, power generation diversion tunnel, surge well, pressure pipeline, power plant, booster station, 110 kV transmission line, etc.
•Designed principle: "no one on duty, few on waiting",

Controlled by integrated automatic computer monitoring system.

Main Building of Dazhaihe Hydropower Station


110 kV Booster Station of Dazhaihe Hydropower Station