Yangxihe Cascade Hydropower Station, Yuanyang County(23.5MW,2*6.6+3*3.5)
•Entrusted by Yunnan Yuanyang Hongyuan
Hydropower Development Co., Ltd(2012)
–Yangxihe third-cascade power station (3 x 3.5
MW, horizontal Pelton, water head 360m) , Put into
operation in June 2012
–Yangxihe second-cascade power station (2 x
6.5 MW, horizontal Pelton, water head 400m), Put into
operation in May 2016
•Project content
–One-stop Service from Installation,
Debugging and Operation Management of Mechanical and Electrical Equipment
•Total capacity :35.5MW(23.5MW has been put into operation).
Main Building of Yangxihe third-cascade power station
6 kV Switching Room of Yangxihe third-cascade Power station
Booster Station of Yangxihe third-cascade Power station
Main Building of Yangxihe second-cascade Power station
6 kV Switching Room of Yangxihe second-cascade Power station
CCR of Yangxihe third-cascade Power station