Qingshan Reservoir Hydropower Station, Hangzhou(4×0.63MW+1×0.4MW)
•Time interval :March,2018~April,2019
•Generator capacity: 4×0.63MW+1×0.4MW
•Vertical Axial Flow, water head 10.5m
+ Horizontal Tubular Axial Extension, water head 9.2m,
•Capacity of 213 million m3 / s,
•Project content: O&M
Main Building of Qingshan Reservoir Hydropower Station
CCR of Qingshan Reservoir Hydropower Station
10 kV Switching Room of Qingshan Reservoir Hydropower Station
Qingshan Reservoir Hydropower Station
Dam of Qingshan Reservoir Hydropower Station
Dam Area of Qingshan Reservoir Hydropower Station
Tailrace Canal of Qingshan Reservoir Hydropower Station