Electrical Testing Projects
•Electrical Preventive Test 电气预防性试验
–Sanchaxi Second-cascade Hydropower Station, Taishun(2×4MW, Vertical mixed flow, Water Head:27m, 110kV) 2007, 2009
–Hongxi Second-cascade Hydropower Station, Taishun(2×4MW, Horizontal mixed flow, 110kV) 2013,
2016。
–Wengxi Hydropower
Station, Taishun(1×1.6MW, Horizontal mixed flow, 10kV)2013,
2016
–Pengxi Hydropower Station, Taishun(2×0.8MW,
Horizontal mixed flow, 35kV)2016
•Electrical Handover Test 电气交接试验
–Tingminghe Hydropower Station, Nujiang River(2×20MW,
Vertical mixed flow, Water Head: 900m,
110kV)
–All the electrical handover tests of the newly built and renovated hydropower stations by our company
Preventive Test, Hongxi Second-cascade Hydropower Station
Electrical Handover Test,Shimen Hydropower Station