•Electrical Preventive Test 电气预防性试验
–Sanchaxi Second-cascade Hydropower Station, Taishun(2×4MW, Vertical mixed flow, Water Head:27m, 110kV) 2007, 2009
–Hongxi Second-cascade Hydropower Station, Taishun(2×4MW, Horizontal mixed flow, 110kV) 2013, 2016。
–Wengxi  Hydropower Station, Taishun(1×1.6MW,  Horizontal mixed flow, 10kV)2013, 2016
–Pengxi Hydropower Station, Taishun(2×0.8MW, Horizontal mixed flow, 35kV)2016
•Electrical Handover Test 电气交接试验
–Tingminghe Hydropower Station, Nujiang River(2×20MW, Vertical mixed flow, Water Head: 900m, 110kV)

–All the electrical handover tests of the newly built and renovated hydropower stations by our company

Preventive Test, Hongxi Second-cascade  Hydropower Station

Electrical Handover Test,Shimen Hydropower Station